Ju Hong Consulting Industry Co., Ltd.

Rooftop green energy system

Application method for rooftop green energy system installation

Photovoltaic green energy is one of the government's major policies, and the most noticeable benefit of installing solar rooftops is the "significant effect on rooftop cooling."

To expand the promotion of renewable energy, the Ministry of Economic Affairs has set a policy target of 20% renewable energy generation by 2025. It is currently actively promoting solar photovoltaic and wind power generation, with the installed capacity of solar photovoltaic power expected to reach 20GW by 2025. Rooftop green energy will soon be available alongside certain factory registration certificates.

The central government is currently considering requiring that the installation of rooftop green energy systems be assessed and reviewed during the improvement process to obtain a special permit. This will cause considerable inconvenience for many applicants and agents. Juhong Company, however, has professional solar energy system partners, offering a one-stop service from special permit to solar energy to special project permits. This saves time in finding separate system providers during the improvement process, allowing for rapid assessment and contracting.

Application method

Taipower parallel connection review → Energy Bureau approves filing → Taipower parallel connection trial operation → Energy Bureau (applies for equipment registration) → Taipower signs contract (formal 20-year feed-in purchase) → Post-construction monitoring and maintenance

Prepare documents

Contact Us

If you have any suggestions or advice, please leave your valuable information and we will reply to you as soon as possible.

Ask A Member
Ju Hong Consulting Industry Co., Ltd.
Inquire About Products
Rooftop green energy system
※Company
※Contact Person
※Contact Number
※E-mail
※Inquiry Content